Municipality of the District of Chester

Strum’s design team completed engineering design in advance of construction and start-up of the Kaizer Meadow 2MW Turbine. This work involved a transportation study, legal and topographic surveys, and a detailed design of site access and laydown areas. Design diagrams, specifications, and tender documents were developed and the tendering process was coordinated by Strum ensuring a smooth process and receipt of competitive bids by qualified contractors.  Construction is complete, with the turbine producing power to the grid. Strum is involved in several other multiple turbine wind farm sites across Nova Scotia.