Strum’s design team completed engineering design in advance of construction and start-up of the Kaizer Meadow 2MW Turbine in the Municipality of the District of Chester. This work involved a transportation study, legal and topographic surveys, and a detailed design of site access and laydown areas. Design diagrams, specifications, and tender documents were developed and the tendering process was coordinated by Strum ensuring a smooth process and receipt of competitive bids by qualified contractors. Construction is complete, with the turbine producing power to the grid.
Strum also completed the Environmental Assessment for this project, which can be found here.